Leaders of VIDIFI Corporation inspected the operation, maintenance and traffic safety assurance on the Hanoi - Hai Phong expressway

10/08/2026

On the morning of August 7, the delegation of Vietnam Infrastructure Development and Financial Investment Corporation (VIDIFI) led by Deputy General Director Pham Viet Son had a field inspection of operation, maintenance and traffic safety on the Hanoi - Hai Phong expressway.

Joining the working group were leaders of specialized departments and divisions of the Project Management and Construction Operation Board (PMO); Leaders and professional staff of Hanoi - Hai Phong Expressway Management and Operation Company Limited; Leader of VIDIFI Road Construction and Maintenance Enterprise; with leaders of VDF Investment and Development Joint Stock Company.

7.8.Ktra.Caotoc6
The VIDIFI delegation inspected the field on the Hanoi - Hai Phong expressway

During the inspection program, Deputy General Director Pham Viet Son and the Working Group inspected key activities related to operation, maintenance and ensuring traffic safety on the route.

Regarding the work of ensuring traffic safety during the stormy season, the Working Group inspected the response plan, drainage system, traffic safety system, trees and preparation of materials and human resources to serve natural disaster response. Thereby, proactively prevent and promptly handle arising situations, contributing to maintaining smooth and safe traffic on the route.

7.8.Ktra.Caotoc3
The working group inspected the drainage system and plans to respond to the stormy season

The delegation also inspected the actual progress and quality of implementation of periodic and unscheduled maintenance items on the route, including:

At section Km57+000 - Km61+000, the Working Group inspected the progress and quality of local road surface treatment due to uneven subsidence, requiring units to carry out the work on schedule, ensure quality, maintain a smooth road surface, and meet technical and traffic safety requirements.

7.8.Ktra.Caotoc5
The working group inspected road surface quality at section Km57+000 to Km61+000

7.8.Ktra.Caotoc2

7.8.Ktra.Caotoc1

Inspect a number of flooded underground tunnel locations in Hung Yen province and direct remedial measures.

7.8.Ktra.Caotoc7
Check at the underground tunnel location in Hung Yen province

After directly inspecting the field and listening to reports from units, Deputy General Director Pham Viet Son gave important instructions, which emphasized the importance of maintaining and maintaining infrastructure and ensuring traffic safety of people and vehicles when traveling on the Hanoi - Hai Phong highway, especially when the rainy season is approaching.

7.8.Ktra.Caotoc4
Representatives of units reported at the working session

At the same time, the Deputy General Director directed the Project Management and Construction Operation Department (PMO) to coordinate closely with Hanoi - Hai Phong Expressway Management and Operation Company Limited, VIDIFI Road Construction and Maintenance Enterprise and related units to urgently complete urgent maintenance items, completely handle road surface subsidence and flooding in underground tunnels; proactively develop and implement prevention and response plans, and be ready to respond to situations that arise during the rainy and stormy season.

In addition, the units focus on increasing regular inspection and maintenance, speeding up the progress of repair items on the route, ensuring smooth road surfaces, clear signage and road marking systems, and ready response plans to keep traffic flowing smoothly and safely for people traveling on the Hanoi - Hai Phong expressway.

The close inspection right before the rainy and stormy season demonstrates the determination of VIDIFI's Board of Directors to constantly improve service quality, affirming the position of the Hanoi - Hai Phong expressway as the leading modern and safe arterial traffic axis in the Northern region.